Elèctrica Pintó SL
Elèctrica Pintó SL


Recovery and Renovation of Canals 3 Well in Castellterçol


Underground Water / Well Equipment

Recovery and Renovation of Canals 3 Well in Castellterçol

At Elèctrica Pintó, we are committed to ensuring the reliability and efficiency of hydraulic infrastructures. Recently, we carried out the recovery of a stuck pump and the renovation of the water intake system at the Canals 3 well in Castellterçol, improving its performance and ensuring an optimal water supply.

Extraction of the Stuck Pump

The first phase of the project involved the retrieval of a submersible pump that had become stuck inside the well, using specialized drilling machinery. This intervention allowed us to remove the equipment without compromising the structure of the well.

Renovation of the Water Intake System

Once the pump was removed, we proceeded with the renovation of the intake system, which included:
✔️ 84 meters of PVC-U blind pipe to ensure the integrity and durability of the conduit.
✔️ 36 meters of PVC-U filter pipe, designed to allow optimal water intake.
✔️ Bottom and surface caps to protect the installation and enhance its longevity.

Project Benefits

✅ Restoration of well functionality.
✅ Improved water intake efficiency.
✅ Installation of protective elements to ensure long-term durability.

This project has successfully recovered a vital water resource for the municipality, ensuring efficient and sustainable water extraction. 🌍💧

📩 For more information about our well recovery and water intake services, contact us today!

  • Recovery and Renovation of Canals 3 Well in CastellterçolRecovery and Renovation of Canals 3 Well in Castellterçol