Well
Gauging

Pumping equipment

Pumping equipment able to take up to 380 m³ / h to a depth of 450 meters. Monitoring and control of water levels in the well and flow extraction electromagnetic flowmeter and pressure transducer.

Gauging wells , aimed at optimum operating out about are basic and further wells when recovering an old well.

We are also specialized in the installation of pumping equipment , submersible pumps, pipes , manifolds, automation , etc. . to evacuate water from the depth needed. Cleaning and recovery wells to larger inputs of water are also possible with HCI injection systems, compressed air and Venturi.

Procedure includes a graphical representation of the evolution decreases over time for several working flows . This representation is made both in semi logarithmic graphics, representing the values of the time in a logarithmic axis. This graph allows us to observe the behavior of the well due to water extraction . Another interesting graph that represents the relationship is specific volume – reduction. In this graph we can “read” the reductions achieved and their relationship.

 

WELL GAUGING

To find the optimal operation of the well:

  • Installation and monitoring of capacity
  • Gauging results
  • Geological reports

 

CLEANING AND RECOVERING WELLS

To improve the performance of the well:

  • Injection of HCI
  • Cleaning with compressed air and Venturi
  • Water capacityWater capacity
  • Water capacityWater capacity
  • Water capacityWater capacity
  • Water capacityWater capacity

Projects

Rehabilitation of the Estació Well and Ca la Viuda Reservoir in Sant Pere Sallavinera
Rehabilitation for Sant Pere Sallavinera
24-09-2023
Rehabilitation of the Estació Well and Ca la Viuda Reservoir in Sant Pere Sallavinera

At Elèctrica Pintó, we work to ensure the quality and …

New equipment for the Otgers well in Castelltallat: ensuring efficiency in water supply
Well installation and equipment in Castelltallat
30-03-2022
New equipment for the Otgers well in Castelltallat: ensuring efficiency in water supply

At Elèctrica Pintó, we work to optimize water resource management …

Capacity in wells at the Casa del Rey in Dubai
Well drilling at the King's House in Dubai
20-02-2014
Capacity in wells at the Casa del Rey in Dubai
Improving Water Capture at Wells in Olot
Boilerwork Olot
6-03-2025
Improving Water Capture at Wells in Olot

At Eléctrica Pintó, we have carried out the modernization and …

Breakdown Repair at the Sant Ponç Reservoir Water Intake
Pump extraction
28-02-2025
Breakdown Repair at the Sant Ponç Reservoir Water Intake

At Eléctrica Pintó, specialists in electro-hydraulic installations, we have carried …

New Solar Pumping System in Alàs i Cerc: Sustainable Water with Renewable Energy
Solar Pumping
13-01-2025
New Solar Pumping System in Alàs i Cerc: Sustainable Water with Renewable Energy

At Elèctrica Pintó, we are committed to implementing efficient and …

Improvement of the groundwater network and new chlorination system in Ciutadella
Ciutadella phreatic network chlorination system
30-10-2024
Improvement of the groundwater network and new chlorination system in Ciutadella

At Elèctrica Pintó we continue to bet on innovation and …

Modification of the Old Well in Calaf
Modification Starters
27-02-2024
Modification of the Old Well in Calaf

In this project at the Old Well of Calaf, Elèctrica …

Electrohydraulic installation renovation
Boiler Renovation
5-04-2023
Electrohydraulic installation renovation
Well Repair
Well Repair
31-01-2023
Well Repair

See all projects »