Elèctrica Pintó SL
Elèctrica Pintó SL


Modernization of the Bellots Pumping Station in Terrassa


Remote Control Systems / SCADA's development / Underground Water / Water Supply

Modernization of the Bellots Pumping Station in Terrassa: More Efficiency and Reliability

At Elèctrica Pintó, we continue to focus on optimizing hydraulic infrastructures and improving energy efficiency. We recently completed the modernization of the Bellots pumping station in Can Boada (Terrassa), a key project to ensure a more efficient water supply, reducing energy consumption and minimizing mechanical wear.

New Pumps and Smart Control

The project included the installation of three pumps with 200 kW frequency inverters, allowing flow rate adjustments according to demand, optimizing energy consumption. This technology enhances pressure regulation and extends equipment lifespan.

Additionally, a multimaster control panel with Modbus RTU and Ethernet IP communication was implemented, improving system management.

Integration with SCADA Remote Monitoring

The system was integrated with SCADA remote monitoring, enabling real-time supervision of pump operation to enhance management and reduce response times in case of incidents.

Rod bearings were also replaced, and the pump-motor assembly was balanced to ensure optimal and long-lasting operation.

Project Benefits

✔️ Reduced energy consumption thanks to frequency inverters.
✔️ Optimized pressure and flow regulation based on demand.
✔️ Remote supervision via SCADA telecontrol.
✔️ Lower mechanical wear and extended system lifespan.

This project reaffirms our commitment to innovation and efficiency in water management. 🌍💧

📩 For more information about our pumping modernization projects, contact us today!

  • Variator installation on Grup BellotsVariator installation on Grup Bellots